- The __________ plan is a preliminary, approximate schedule of an organization’s overall operations that will satisfy the demand forecast at minimum cost.
- Which of the following is FALSE about supply chains?
- The inventory turnover is calculated using the annual cost of goods sold and the aggregate inventory value on average.
- Which of the following statements about Supply Chain Management (SCM) is correct?
- It is not unusual for fire departments to use “slack months” for building inspections, conducting prevention programs and giving talks as a way to have anti-cyclic outputs.
- Assume that Company F produces a variety of smartphones sequentially on three machines. The times required on each machine for one typical racket are as follows: M1: 3 minutes M2: 8 minutes, M3: 2 minutes, M4: 5 minutes. The throughput time for a smartphone is :
- Purchasing tends to follow three practices; which of the following is NOT one of them?
- In order to leverage the location decision to enhance the development of long-term capabilities, the first step is to:
- Which of the following are measures of capacity in terms of outputs and inputs produced for the corresponding production system?
- Which of the following is/are (a) technique(s) used for increasing short-run capacity
- Logistics includes the responsibility for acquiring the goods and services the organization needs, by any means.
- Efficiency is defined as input divided by output.
- In planning the long-term capacity of an operation, one should take into account:
- Obtaining lower unit costs through the use of larger facilities is called economies of scope.
- The first step to enhancing the development of long-term capabilities is to identify potential locations.
- Organizations that process natural or basic resources as raw materials or other essential inputs to obtain their outputs will locate near their resources if one of the following conditions holds:
- Yield management, also known as revenue management is the amount of output of acceptable quality emerging from a production system compared with the amount that entered it.
- __________ means deciding which jobs to assign to which work centers.
- When a resource is scheduled as if it had unlimited capacity to handle any and all jobs, its schedule is called
- Logistics consist(s) of the following, EXCEPT:
- Under sole-sourcing arrangements, customers involve suppliers from the design stage, asking for larger deliveries of higher quality items in large batches that enable greater savings.
- __________ inventories exist because materials must be moved from one location to another.
- Yield or revenue management would NOT be so appropriate if which of the following circumstances is present?
- In locating pure services, which of the following measures are recommended in the literature on health clinics and can be used for trial-and-error procedures?
- The cycle time of the process is the reciprocal of the output rate.